General Roofing Installation
Metal roof systems sheeted, flashed and sealed for warehouses, plants and hangars — laid bay by bay to a weathertight handover.

What metal roofing covers
A metal roof is a system: purlins or deck below, insulation, the sheet itself, then the flashings, gutters and closures that keep water out at every edge. Red Ocean installs the full stack on industrial buildings — new warehouses, plant extensions and re-sheets of roofs that have reached the end of their service life.
The service sits under roofing and envelope alongside roof purlins and roof envelope and bracing. Order sheeting on its own when the purlins are already in place, or the whole package as one weathertight shell.
Re-sheets are the common job: the sheeting and fasteners have reached the end of their life while the frame still stands, and a new surface buys another service life without touching the structure. We lift-test the old sheet, sample the fastener pattern and check the purlins underneath for corrosion before the first new panel is ordered. Where the purlins have wasted away, roof purlins joins the same package, so what sits under the new sheet is sound — not only what you can see.
Laid out before it is ordered
We survey first: deck condition, span measurements, upstand heights, drainage falls and every location that will penetrate the roof — vents, cable trays, air-conditioning bases. The sheet layout is then set so fastener rows stay straight, cuts fall in the right places and waste is minimised.
Flashings are prefabricated to the actual profile and delivered with the sheets rather than improvised on site. Insulation is fitted while the roof is open, so nothing has to come apart later to add it.
Insulation follows the use of the building: blanket under trapezoidal sheet for most warehouses, rigid board where the deck must carry traffic, and insulated panel systems where the thermal envelope and the finished surface are one product. Vapour control layers and foil facings are lapped and taped to the drawing so the barrier is continuous rather than approximately in place. Deliveries are timed with the sheeting crew so the material spends the minimum time open to the weather.
Sequenced around the weather
Rain and heat both drive the programme. We monitor forecasts, keep sheeting inside the dry window and stop work when a wet or hot surface cannot be safely worked. Bays are completed and closed one at a time, so a sudden shower never finds an open building.
Crews above ground work under fall protection. Where fall protection systems are already installed on the roof, we use them and keep clear of lifeline routes; where they are not, temporary edge protection goes up before the first sheet.
Communication runs daily: the crew reports what closed, what is open and what the forecast means for tomorrow, so your operations team knows which bay will be dry tonight. Fixings are driven to the manufacturer's torque rather than by feel, and a fastener that starts to spin — a sign it has lost its grip — is replaced and recorded. Sealant waits for dry, clean surfaces, because a line laid on damp or dusty metal is the leak you find in the first storm.
A roof that stays dry
Handover includes water testing of completed areas, the as-built sheet layout, a penetration register and supplier warranty documents where the specification provides for them. Your facilities team receives a maintenance checklist: gutter clearing, a fastener re-torque schedule and inspection points ahead of storm season.
After handover, repairs and inspections run through field maintenance, so small defects are caught before they become leaks. Send your roof drawings and we will walk the scope with you.
What’s included
Order any item on its own or as a full package with our roofing and steel teams.